Below is a summary of some of the key areas we test and inspect:
Engine:
- Shutdowns tested at least 3 times during our test process.
- Physical connections to the base frame, radiator and alternator inspected.
- Charge alternator tested.
- Fuel pump inspected, fuel solenoid checked, fuel linkages lubricated.
- Fuel hoses inspected.
- Filters changed as required and air filter assembly checked.
- Oil tested and changed as required.
- Low oil pressure and engine temperature.
- Fan belts inspected, recorded and changed as necessary.
Radiator:
- All hoses checked.
- Fan blades and radiator fins checked.
- Radiator checked for fin blockage and cleaned as required.
- Coolant tested and changed as required.
- Fan guards checked and rectified.
- Radiator cap checked operationally.
Alternator:
- AVR checked and tested.
- Physical connections to the engine and base frame tested.
- Internal inspection of slip rings and diodes completed as required.
- Megger test if required.
Control Panel:
- Display checked.
- Warning lights and instrumentation checked.
- Fuses, relays and cables inspected.
- Panel settings for autostart and any timers recorded.
- Auxiliary inputs recorded.
Miscellaneous:
- Circuit breaker checked for correct operation.
- Batteries checked and changed as required.
- Battery charger and jacket water checked if applicable.
- Exhaust system checked.
- Exhaust condensate checked and drained.
Load Test:
- All generators tested at 25%, 50%, 75% & 100% of rated load.
- 50% load acceptance/load rejection tests completed and recorded.
- Voltage and Frequency variation on load recorded.
- Voltage and Frequency stability on load recorded.